The Watermark Project is expected to generate approx. 21,000 daily driveway trips and 18,000 daily cumulative trips not including the MedImpact buildings.
The levels of service (LOS) now/existing and with the pending Watermark Project along SPP are:
(I-15 Ramps – Scripps Highland) => existing = E, with Watermark = F
(Scripps Highland – Scripps Summit) => existing = C, with Watermark = E
(Scripps Summit – Spring Canyon) => existing = C, with Watermark = C
(Spring Canyon – Scripps Creek) => existing = E, with Watermark = F
(Scripps Creek – Cypress Canyon) => existing = E, with Watermark = E
(Cypress Canyon – Anqelique) => existing = D, with Watermark = E